Probeer Semrush One kosteloos uit
Het toonaangevende platform dat SEO-autoriteit verenigt met AI-zichtbaarheid.
Koop nu je ticket
Eén dag, échte strategieën. Voor marketeers die er helemaal voor gaan.
13 oktober 2026Londen, VK
Kennisbank
Integrations
Looker Studio
How do I change the date range in Looker Studio reports?

How do I change the date range in Looker Studio reports?

In Position Tracking Connector reports, the date range defaults to Last 28 days (excluding today), and can be changed from the right side menu:

Looker Studio date range menu

In Domain Analytics connector, the only report that allows to change the date range is the Domain History report (all other reports will show up-to-date data). For Domain History, you can also change date range from the right side menu.